Trending topics
AMALAPURAM
The story up until now:
Twenty-six years after its structure stone was laid, the 57-km Kotipalli-Narsapur train line in Dr. B.R. Ambedkar Konaseema district is still unbuilt, and the project for it has actually been restored. At a round-table conference in Amalapuram on Tuesday (September 29, 2026), the Konaseema Railway Sadhana Samithi (KRSS) chose to introduce an individuals’s motion, ‘Praja Galam’, and a require a Konaseema bandh. The conference was contacted reaction to The Hindu’s Spotlight report of September 18, ’25 years on, Konaseema Railway Line job yet to get on track’, copies of which were dispersed amongst the individuals.
What is the Kotipalli-Narsapur job?
The line was the concept of G.M.C. Balayogi, India’s very first Dalit Lok Sabha Speaker, who was from Amalapuram. On November 16, 2000, the then Railway Minister Mamata Banerjee laid the structure stone together with Mr. Balayogi for the line in Amalapuram town.
The job was prepared in 3 stages: Kotipalli-Amalapuram (12.70 km), Amalapuram-Chinchinada (33.88 km) and Chinchinada-Narsapur (10 km), with significant bridges throughout the Gouthami, Vynateya and Vasista, according to South Central Railway (SCR) authorities. The SCR has actually finished over 98% of the base, consisting of the pillars for the bridges.
Individuals hold up copies of The Hindu’s Spotlight report on the train job at the conference in Amalapuram on Tuesday.|Picture Credit: Special Arrangement
Why has it stalled?
According to Union Minister for Railways Ashwini Vaishnaw, the approved expense of the task is 2,120 crore on a cost-sharing basis, with the Andhra Pradesh federal government needed to offer 25 % of the overall expense. Over the previous 24 years, the State federal government has actually transferred just 52.69 crore, versus a share of about 530 crore; the Ministry of Railways had actually invested 1,181.19 crore by March 2024.
K. Sridhar, Deputy Chief Engineer of the South Central Railway, stated: “The State federal government has actually dedicated to turning over 238 hectares of land complimentary of expense. We are waiting to continue with the next stage of work when the State federal government turn over the land.”
Campaigners put the blame on the State. “The State federal government is to be blamed for the hold-up in execution of the train task,” stated B.N.S. Murthy, BJP Amalapuram Assembly Constituency in-charge and KRSS Steering Committee member. The Ministry of Railways had actually currently launched its share, and the State had actually stopped working to total land acquisition and develop the 3 bridges throughout the Godavari, he stated.
Trainees at the Konaseema Railway Sadhana Samithi conference in Amalapuram on Tuesday required an online project for the train line.|Image Credit: Special Arrangement
What does Konaseema lose without it?
KRSS Convenor E.R. Subramanyam stated:”Nearly 150 bus services are being run daily from numerous towns in the Konaseema area to significant cities, Vijayawada and Hyderabad, with a high walking in fare, which is 3 times more than the train fare. Lack of rail connection has actually struck the export of coconut and its export capacity.”
Ambajipeta Coconut Copra Merchants Association President Srinu stated the expense of carrying copra might be cut in half if the Kotipalli-Amalapuram area were commissioned. Copra merchants now take their fruit and vegetables to the Rajamahendravaram train station, where it is filled onto wagons for export.
Dr. B.R. Ambedkar Konaseema District Autorickshaw Union President Satyaraju stated an approximated 10,000 autorickshaw operators would make an income if the line were commissioned. About 17,000 autorickshaws now run in the district. “We will be prepared to straight take part in the motion for the train job,”stated Mr. Satyaraju.
Together, Amalapuram trainees Vasista Durga, Indraani and Bhavani required an online project through social networks, recording the goals and battles of the farmers for rail connection. “It has actually been a long haul for almost 17 lakh individuals of the district for over a quarter century for the train job. In spite of being a significant tourist area in South India, the Konaseema area is stopping working to enjoy take advantage of the tourist sector in the lack of rail connection,” they stated.
What are the advocates preparing?
The KRSS, led by Mr. E.R. Subramanyam and Kalvakuntla Tataji, passed 4 resolutions: an action prepare for individuals’s motion,”Praja Galam”, to be all set by October; a Konaseema bandh; a conference with all political celebrations; and a conference with Chief Minister N. Chandrababu Naidu and his deputy equivalent K. Pawan Kalyan.
Mr. Tataji, President, Amalapuram Chamber of Commerce, and KRSS Steering Committee member, stated a delegation would quickly fulfill Mr. Pawan Kalyan to advise him of his guarantee on the job. “Everybody requires to take to the roadways and raise their voice versus the excessive hold-up in commissioning the job. Crossing political celebrations, the KRSS will connect to the youths, females and towns to participate the motion,” he stated.
Y.D. Rama Rao, President, Cocanada Town Passengers Association, required talks with Mr. Pawan Kalyan and Mr. Naidu before the future course of the motion was settled. “It’s about time to look for due attention for the train line task from the State federal government. The NDA partners in the State can persuade the Centre to finish the train task with no contribution from the State,” he stated.
MLC Kudupudi Suryanarayana (East Godavari Local Authorities ‘Constituency) required stopping the automobiles of the Oil and Natural Gas Corporation (ONGC) and Reliance and declining to work together with their oil and gas expedition to put pressure on the State and Central federal governments.”Simultaneously, we need to firmly insist that our MLAs and MLCs from the Konaseema area speak on the existing status of the task in the next Assembly and Council session. The job was the significant survey pledge of the NDA partners for our area. I will likewise speak on this problem in the Council set up to be kept in October,” he stated.
Mr. Murthy proposed boycotting the regional body elections throughout the district. Yalla Subramanyam of the Bharatiya Kisan Sangh, who led the Konaseema Crop Holiday motion in 2011, stated an individuals’s motion was the last option due to the fact that the State had actually selected to stay quiet on the task. Uppuganti Bhaskar, an activist who deals with farmers, proposed a relay cravings strike at the district head office in Amalapuram.

Discover more from PMN S.P.O.R.T.S - A PRIME MEDIA NETWORK BRAND
Subscribe to get the latest posts sent to your email.

